
Specializing in air conditioning and refrigeration, central air ducts, and air extraction and purification stations.
We have been operating in the Egyptian market since 2010, selling home and industrial air conditioning units.
We specialize in sheet metal work for air ducts, ventilation, and central air conditioning.
We design and implement central air conditioning and air purification stations.
We design and implement sterilization and dust removal rooms.

Ventilation is the process of exchanging air within a given space to remove polluted air and provide fresh, healthy air. Ventilation plays an important role in improving air quality and providing a comfortable living or working environment. Ventilation openings, such as windows or air vents, are used to allow fresh air to flow into a building and exhaust polluted air.

Thoroughly flush the section to be cleaned with fresh water to remove any dirt, dross and debris from pipework. Each section is isolated in turn until clean strainers are inspected at regular intervals. After the final high-velocity flush, the system shall be filled and a dispersant polymer added; this shall be circulated for 24 hours before draining. No other procedure will remove the magnetic sludge, which adheres to the pipe wall, and keep it in suspension for draining
Once the system is clean it should be drained and filled from the bottom up. Filling should be slow, taking care to remove air from extremities and high points. Then circulate for a further 24 hours. At regular intervals during this period strainers are to be isolated and cleaned, drain points opened to remove any debris arising from the cleaning agent. Drain and fill the system until all tracers of the cleaning agent and debris are removed and the pH of the water in the system is in the range of 7-8. The water shall be tested to demonstrate requirement, compliance with this
Drain the system, add sacrificial anodes an flow limiter cores, refill the system with fresh water and add chemical for the treatment. On no account should any part of the system be drained and left empty and wet for any significant time after cleaning, as this will promote rapid corrosion and possibly necessitate a re-clean. This work shall be carried out before the commissioning engineer or consultant as per the site requirements. The inspection and .cleaning reports shall be generated and signed off